Another section of the old Railroad
bed is transformed into a Bike Path
A large jpg of the area map here.
(5+meg Quad).
fs
Late in the Fall of 1999 we began. The first step is to establish the proposed centerline and mark out clearing limits. Here are side stakes at 100 foot intervals for clearing and rough grade. This section is very straight. It has one long slow curve at the North end and some traffic saftey slow-down squiggles at the intersections.
There was some excavation but most of the bed is much the same, grade and alignment wise, as it was for the trains.
The finishing touches..
..and the finished product.
Nailing sleepers to cusion the deck. After replacing some cross bracing and cleaning the old steel a laminated wooden decking will be clamped to the beams.

There are a few spots that may need a little paint